How Floating Solar Installation Works
From consultation to commissioning in just 6-8 weeks - 10x faster than traditional floating solar
Timeline Comparison
Traditional Floating Solar Timeline: 18-27 months
FloatSolar Timeline: 6-8 weeks
That's up to 10x faster deployment for qualifying private ponds
Detailed Floating Solar Installation Process
What Makes FloatSolar Different?
Traditional floating photovoltaic (FPV) installations require extensive environmental impact assessments, wetland permits, Army Corps of Engineers approval, and often state-level environmental review. This process typically takes 18-27 months before a single panel can be installed.
Following Sackett v. EPA (2023), "waters of the United States" is now limited to relatively permanent standing or flowing waters and wetlands with a continuous surface connection to such waters. As a result, a privately owned, isolated stormwater retention pond, process pond, irrigation pond, or quarry lake is frequently non-jurisdictional and non-navigable - meaning no Clean Water Act §404 permit and no Rivers and Harbors Act §10 permit applies. This is what removes 18-24 months from a traditional floating solar timeline. Whether this applies depends on the specific water body and state, and local building permits, electrical permits, and utility interconnection requirements still apply. FloatSolar offers a free jurisdictional pre-screen: send us your pond's location and we'll tell you, in writing, which permits apply to your site and which don't.
Who Installs FloatSolar Systems?
FloatSolar systems can be installed by qualified solar contractors with marine experience, or through our network of certified wholesale partners. We provide comprehensive installation training and technical support for every project.